[lsft_커스텀_드롭다운_이름]
찾다
이 검색창을 닫으세요.

How to operate the cable conveyor

목차

What is cable conveyor

A cable conveyor is an electric machine used for laying power or communication cables. It is widely applied in cable laying construction scenarios such as urban power grid transformation, tunnels, and pipelines. It can effectively reduce labor intensity, significantly improve construction quality and efficiency, and has advantages including high pulling force, small size, light weight, and easy operation, thus its application is becoming increasingly widespread

Cable conveyors mainly have three drive types: diesel, gasoline, and electric. Most of these devices adopt dual-axis drive technology and a rubber crawler clamping system, are equipped with supporting rollers, and feature an intelligent remote control function and a multi-unit linkage design. They can also work in linkage with supporting equipment such as 케이블 윈치 and cable-releasing pulleys.

cable conveyor structure

The 10 steps to operate the cable covneyor

  1. Place the machine on a stable workbench and fix the entire machine firmly.
  2. The equipment’s grounding wire must be effectively grounded.
  3. Connect the power cord according to the marks on the power cord, turn on the power, and the voltmeter will display the supply voltage
  4. Turn on the panel switch button and the remote control power switch button; the display screen will stay on continuously.
cable conveyor structure

5. Operate the buttons on the control panel or remote control, and the machine will work normally.

cable conveyor control panel

6. Cable paying-off/taking-out: Rotate the crank to open the crawler, place the cable to be conveyed inside, then rotate the crank in the reverse direction and press the crawler tightly. Operate the control panel or remote control to start the machine (if the cable slips, the crawler can be pressed a bit tighter appropriately). When cable paying-off is completed, stop the machine, rotate the crank to open the crawler, and take out the cable from above.

put cable on the cable conveyor

7.After use, turn off the panel switch button (the display screen will go out), then disconnect the power supply and turn off the remote control power switch button.

8.When the cable to be conveyed is too heavy or too long, the machine may be overloaded or the cable may slip. Using a single machine will be difficult to meet the construction requirements, so multiple cable conveyors need to be used in series. When used in series, all conveyors should be adjusted to run in the same direction, and cable pulleys should be added between each conveyor to prevent the cable from contacting the ground.

two machine connect together

9. If the crawler is too loose or too tight, rotate the set screw at the crawler’s driven wheel to make adjustments.

10. In case of sudden shutdown during use, first disconnect the power supply, turn off the machine, check whether there is a fault in the machine and motor circuits, and restart the machine only after the fault is eliminated.

    저는 cabletug.com의 수출 영업 이사인 제리입니다. 케이블 설치 분야에서 15년 이상 근무해 왔습니다. 케이블 컨베이어, 케이블 윈치에 대한 문의는 언제든지 연락주세요.

    ko_KRKorean

    빠른 견적을 요청하세요

    당사 수출 관리자가 영업일 기준 1일 이내에 연락을 드리겠습니다. 이메일 주소 jerry@cabletug.com을 참고해 주시기 바랍니다.

    cable pulling machine in stock
    cable pulling machine assemble site

    잠깐! 케이블 설치 중 시간을 절약하고 케이블 손상을 방지하고 싶지 않으세요?

    케이블 컨베이어나 케이블 풀링 머신을 찾고 계시다면, 저희는 귀하에게 딱 맞는 솔루션을 제공해 드립니다.